G200 general waste incinerator

Addfield · Ironbranch Solutions

G200 general waste incinerator.

A general-waste incinerator for operations needing a larger hourly processing capacity.

Addfield G200
Manufacturer photography: Addfield. Shown equipment and accessories vary by configuration.
Up to 200 kg/hmanufacturer hourly burn-rate guide
4.35 m³ / approx. 153.6 ft³chamber volume
Frontloading method

Capacity is a manufacturer guide, not a guaranteed operating output. Waste composition, moisture, loading, cooling and available hours affect performance. We confirm the specification against your waste and site before quoting.

The details that matter

G200 specifications.

Published burn-rate guideUp to 200 kg/h / approx. 441 lb/h
Published chamber volume4.35 m³ / approx. 153.6 ft³
Published chamber dimensions3m x 1.35m Ø (manufacturer dimensions)
Loading MethodFront
Gas Retention Time2 seconds
Fuel OptionsDiesel, LPG, Natural Gas, Bio Fuel

Source: Addfield’s published product information, checked October 2026. Approximate imperial conversions are provided for planning. Final equipment, emissions controls and site requirements are confirmed for each project.

Built around your operation

How it fits your work.

  • Front-loading access for the planned waste-handling process.
  • Manufacturer options include ram loading and hydraulic bin tipping.
  • Touchscreen controls provide an overview of plant operation.

Plan the full package

Discuss your setup.

We will review loading and handling, fuel supply, the operating schedule and site access with you. Let us know if you need help arranging installation, training or a suitable spare parts package.

Shipping, installation, utility connections and local approvals are project specific. Ask Ironbranch for a package based on your location and requirements.

Before you choose.

What information helps you recommend a setup?

Tell us the waste type, weight per day or batch, the largest item’s dimensions and weight, your location and available fuel. We will help check chamber fit and processing requirements.

Can you help with pricing and delivery?

Yes. Share your delivery location and intended setup. We will prepare an equipment proposal and confirm shipping, installation and other allowances before an official quote.

Are permits and emissions requirements the same everywhere?

No. Local requirements depend on the site, waste and equipment configuration. Confirm these with the relevant authority before purchasing or installing.

Talk to Ironbranch

Let’s find the right setup.

Ask Jordan about the G200 and get help planning your equipment package.

jordan@ironbranchsolutions.org
Jordan · International calls via WhatsApp: +1-217-473-5551
Lynn · North America calls: +1-217-473-0098