Addfield · Ironbranch Solutions
C200 medical waste incinerator.
A high-capacity clinical-waste system for facilities needing a planned continuous processing workflow.

Medical waste requires a site-specific specification. The listed throughput is a manufacturer guide, not a permitted waste list or a guaranteed output. We will confirm the waste types, controls and local approval requirements for your project.
The details that matter
C200 specifications.
| Published burn-rate guide | Up to 200 kg/h / approx. 441 lb/h |
|---|---|
| Published chamber volume | 4.35 m³ / approx. 153.6 ft³ |
| Published chamber dimensions | 3m x 1.35m Ø (manufacturer dimensions) |
| Loading Method | Front |
| Refractory thickness | 191mm – 226mm |
| Gas Retention Time | 2 seconds |
| Fuel Options | Diesel, LPG, Natural Gas, Bio Fuel |
Source: Addfield’s published product information, checked October 2026. Approximate imperial conversions are provided for planning. Final equipment, emissions controls and site requirements are confirmed for each project.
Built around your operation
How it fits your work.
- Designed for clinical waste from hospitals and specialist waste-handling facilities.
- Discuss automatic loading, ash handling and gas cleaning for the required waste stream.
- Final throughput and plant layout must be matched to waste density and operating hours.
Plan the full package
Discuss your setup.
Discuss waste segregation, loading, ash handling, monitoring and filtration with us. The configuration must match the waste composition and the requirements at your proposed site.
Shipping, installation, utility connections and local approvals are project specific. Ask Ironbranch for a package based on your location and requirements.
See the equipment on YouTube.
Manufacturer video. Features shown may depend on the model and configuration.
Watch Addfield’s video on YouTubeBefore you choose.
What information helps you recommend a setup?
Tell us the waste type, weight per day or batch, the largest item’s dimensions and weight, your location and available fuel. We will help check chamber fit and processing requirements.
Can you help with pricing and delivery?
Yes. Share your delivery location and intended setup. We will prepare an equipment proposal and confirm shipping, installation and other allowances before an official quote.
Are permits and emissions requirements the same everywhere?
No. Local requirements depend on the site, waste and equipment configuration. Confirm these with the relevant authority before purchasing or installing.
Talk to Ironbranch
Let’s find the right setup.
Ask Jordan about the C200 and get help planning your equipment package.
jordan@ironbranchsolutions.org
Jordan · International calls via WhatsApp: +1-217-473-5551
Lynn · North America calls: +1-217-473-0098
